All mooring buoys have been inspected and two that needed preventative maintenance have been dealt with. Dock repair is ongoing and is expected to be completed in the next ten days, at which point the float and dinghy will be made available for access to your craft. In the meantime, feel free to access your buoy from the beach with your own dinghy. Currently we are competing for barge time with all the other repairs in Howe Sound; all from the same early January storm!
Once the dock is available, keys will be distributed to new buoy users.
Thanks for your patience!
David Smith
Waterfront Director – TBCA